Mine Legislation | MCQ Multiple Choice Questions (21 - 30)

Mine Legislation | MCQ Multiple Choice Questions (21 - 30) 






QUESTIONS HERE .....!!!


21)  Burden is the distance between


a) Two blast holes in same row                          b) distance between two rows

c)  First row of the blast holes and bench         d) none is correct


22)  Who will set permanent or temporary speed limits, for any area of the Mine or any vehicle or class of vehicle?


a) Mines Manager           b) Sr. Official.                       c) DGMS                            d) Mines Foreman.


23)  If any employee contracts a notified occupational disease, the Mine Management shall send notice to Regional Inspector in


a) Form ‘I’                     b) Form ‘II’                           c) Form IV ‘C’                     d) Form ‘V’



24)  To measure the performance of the blast which factor is calculated?


a) Tonnage factor                      b) space factor          c) stripping ratio                 d) Powder factor


25)  No working shall be made within road or building....................meters of any railway or of any public work or of any public


a)  60                b) 200                    c) 45                      d) 50


26)  Voltage limits shall not exceed for general lighting in Opencast Mines?


a) 125 Volts.        b) 650 Volts.        c) 250 Volts.        d) 11KV


27)  Pointing  out  of  contraventions  by  Chief  Inspector  or  Regional  Inspector  of  Mines shall  be  entered  in


a) Form-V                      b) Form-VI                            c) Form-IV C                        d) Form-IV A


28)  Operator’s Seat in the Vehicle / HEMM s should be                                     designed to have adequate comforts while driving continuously.


a) Scientifically           b) Technically                     c) Both ‘a’ & ‘b’                  d) Ergonomically


29)  Workmen Inspector is designated by                                              in consultation with the registered trade union in the mine.


a) DGMS        b) Mines Manager             c) Owner/Agent                 d) Mines Foreman


30)  In Opencast Mining, the width which is extracted from the working bench is termed as


a) Cut             b) Bench width       c) bank width                       d) Bench face


ANSWERS  FOR FOLLOWING QUESTIONS



21c

22a

23d

24d

25c

26c

27b

28d

29b

30b


MINING ENGINEERING 

THANK YOU

No comments:

Post a Comment

MINING MACHINERY QUIZ HAULAGE (7) (67- 80) 14 Questions....! | . MINING ENGINEERING

  MINING MACHINERY QUIZ (7) (67- 80) 14 Questions....! | . MINING ENGINEERING  MINE HAULAGE...........?...................?....! MINING ENGI...