HERE THE QUESTIONS FOR YOU MINING ENGINEERS (Q1 to Q10) AND
(ANSWERS ARE BELOW THE QUESTIONS)
CLICK ON THE LINK TO JOIN WhatsApp (GROUP)
https://chat.whatsapp.com/CQMdLDTRYlpJ4SvTdlctqy ( OR)
Q1)
The life of the M.S pipe used in sand stowing is......lac ton of sand?
1) 4
2) 6
3) 8
4) 10
Q2)
Which portion of pipe damaged more in sand stowing?
1) upper portion
2) middle portion
3) 2/3 from the top
4) lower
portion
Q3)
The upper portion of the sand stowing pipe is generally changed after the transport of ....lac ton of sand?
1) 1 -
2
2) 2 - 4
3) 4 - 6
4) 6 - 8
Q4)
In sand stowing incorrect profile will effect..?
1) cavitaiton
2) wear on pipes
3) setup pulsation
4) jamming
Q5)
In sand stowing high local velocity of sand results?
1) cavitaiton
2) wear on pipes
3) setup pulsation
4) jamming
Q6)
In hydraulic sand stowing the H/L ratio for reasonably good stowing rate?
1) 1:5
2) 1:6
3) 7:1
4) 1:7
Q7)
In hydraulic sand stowing the pipe end should away from the dip of the boxing is ?
1) 5 m
2) 6.5m
3) 7.5 m
4) 9m
Q8)
In hydraulic sand stowing the throw of the sand without nozzle is ...m and with nozzle is ...m?
1) 2 ; 6
2) 3 ; 7
3) 4 ; 8
4) 5
; 9
Q9)
To stop the stowing which is done to avoid the jamming of the pipe ?
1) water should be stopped first
2) sand
should be stopped first
3) both should be stop at a time
4) none of the above
Q10)
For deeper mines the sand:water ratio in sand stowing is?
1) 1:1
2) 1:3
3) 3:1
4) 1:1.3
ANSWERS FOR ABOVE QUESTIONS
Q1) 2 Q2) 1 Q3) 2 Q4) 1 Q5) 2
Q6) 4 Q7) 3 Q8) 2 Q9) 2 Q10) 4
subscribe
THANKS FOR VISITING US........
WELLCOME
No comments:
Post a Comment